Analisa Kinerja Sumber Daya Manusia pada Proyek Pembangunan Gedung (Studi Kasus Pembangunan Gedung Poliklinik RSUD Dr.Abdoer Rahem Situbondo)

Zakariya, Hari (2018) Analisa Kinerja Sumber Daya Manusia pada Proyek Pembangunan Gedung (Studi Kasus Pembangunan Gedung Poliklinik RSUD Dr.Abdoer Rahem Situbondo). Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

[img] Text
PENDAHULUAN.pdf

Download (375kB)
[img] Text
ABSTRAK.pdf

Download (36kB)
[img] Text
BAB I.pdf

Download (46kB)
[img] Text
BAB II.pdf
Restricted to Repository staff only

Download (151kB)
[img] Text
BAB III.pdf
Restricted to Repository staff only

Download (52kB)
[img] Text
BAB IV.pdf
Restricted to Repository staff only

Download (377kB)
[img] Text
BAB V.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
BAB VI.pdf
Restricted to Repository staff only

Download (37kB)
[img] Text
lampiran.pdf
Restricted to Repository staff only

Download (169kB)
[img] Text
ARTIKEL.pdf

Download (2MB)

Abstract

In the world of construction services, the performance of human resources / labor is one of the determinants of the success of development projects. In measuring the level of performance of human resources / labor there are various ways, one of which is to examine human resources at the time of planning by comparing human resources implementation time on each - each job, that is up to how the level of effectiveness of workers in the work. The purpose of this study is to determine the feasibility of the work plan made by the owner of the project plan what is in accordance with the implementation of the building plan of clinic RSUD Dr.Abdoer Rahem Situbondo using effective labor management using AHSP made by the project owner with AHSP SNI to know the need of human resources (project workforce) used as a reference in the calculation of construction project resources in accordance with the condition of the building project of clinic RSUD Dr.Abdoer Rahem Situbondo. From the results of data analysis that has been done is known that the implementation of the building project Polyclinic RS obtained network planning results work duration rill 132 working days with the difference of working days 33 days faster than the plan 165 working days. In the implementation of the project does not happen delays, only on the work process there is a non-significant but not resolved. Effective manpower management is done by recruiting a disciplined, experienced, skilled and responsible workforce on the job so that a good job is achieved. Comparison of AHSP contract and AHSP SNI obtained AHSP efficiency 62% contract and AHSP SNI SNI 61% with difference of labor difference happened that is 552 labor. Where there are major jobs that experienced a considerable margin on the floor work and the wall of the crew was 637 workers. a significant difference between the workforce of the plan and the realization work on the RS polyclinic development project, which is seen in reinforced concrete work with 70% labor efficiency, wall work with 75% labor efficiency, and roof skeletal work with the level of energy efficiency 66% workforce. It is suggested that there should be a reevaluation of the value of labor unit price analysis in order to avoid a significant difference in each job. The analysis should be done not only on the needs of workers, but also there is an analysis of the needs of materials, materials, and tools.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Project Performance;Human Resources;AHSP
Subjects: 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering
Divisions: Faculty of Engineering > Department of Civil Engineering (S1)
Depositing User: Hendri Uut Fahrullah
Date Deposited: 30 Dec 2019 03:36
Last Modified: 30 Dec 2019 03:36
URI: http://repository.unmuhjember.ac.id/id/eprint/3217