Evaluasi Konstruksi Jalan Jalur Lintas Timur di Desa Sumberejo Kecamatan Sukodono Kabupaten Lumajang



Ekamarga, Moh. Firdaus (2018) Evaluasi Konstruksi Jalan Jalur Lintas Timur di Desa Sumberejo Kecamatan Sukodono Kabupaten Lumajang. Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

[thumbnail of PENDAHULUAN.pdf] Text
PENDAHULUAN.pdf

Download (103kB)
[thumbnail of ABSTRAK.pdf] Text
ABSTRAK.pdf

Download (19kB)
[thumbnail of BAB I.pdf] Text
BAB I.pdf

Download (56kB)
[thumbnail of BAB II.pdf] Text
BAB II.pdf
Restricted to Repository staff only

Download (494kB)
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Repository staff only

Download (23kB)
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Repository staff only

Download (32kB)
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Repository staff only

Download (884kB)
[thumbnail of BAB VI.pdf] Text
BAB VI.pdf
Restricted to Repository staff only

Download (21kB)
[thumbnail of ARTIKEL.pdf] Text
ARTIKEL.pdf

Download (640kB)

Abstract

Highways are dirt paths above the earth's surface created with shapes, sizes and types of construction so that they can be used to funnel people, animals and vehicles transporting goods from one place to another easily and quickly (Clarkson H. Oglesby, 1999).
The Eastern Lane (JLT) of Lumajang Regency is a road connecting the northern road (Lumajang-Jember road) and the southern road (Lumajang-Kencong road). The road becomes an alternative way for vehicles passing through Lumajang regency without going through the central city route of Lumajang Regency. Road geometric planning is part of a plan that determines the stated dimensions of a path and its parts. From the geometric planning of this road, the road pavement will be carried out. Determination of pavement thickness in accordance with the required highway, also must be adjusted with technical requirements so that the planned road construction is optimal. Road pavement generally includes surface layer, base layer, sub base layer, and subgrade layer. The road pavement is carried out in accordance with the pavement thickness plan according to the age of the plan, or gradually. From the results of the study is expected to be made into planning evaluation with attention to the development of traffic and geometric conditions of roads and road construction conditions that can support the safety and comfort of road users.

Contribution
Contributor Name
NIDN/NIDK
UNSPECIFIED
Salim, Noor
nidn0021016301
UNSPECIFIED
Manggala, Adhitya Surya
nidn0727088701

Item Type: Thesis (Undergraduate)
Keywords/Kata Kunci: Road Construction Evaluation of East Lebak Road Lumajang District
Subjects: 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering
Divisions: Faculty of Engineering > Department of Civil Engineering (S1)
Depositing User: Hendri UF | hendri@unmuhjember.ac.id
Date Deposited: 02 Jan 2020 02:11
Last Modified: 02 Jan 2020 02:11
URI: http://repository.unmuhjember.ac.id/id/eprint/3239

Actions (login required)

View Item View Item