[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

DERMAWAN, SETYO BAGUS (2026) ANALISIS PERCEPATAN WAKTU PEKERJAAN PROYEK KONSTRUKSI DENGAN OPTIMALISASI BIAYA (STUDI KASUS : REHABILITASI JARINGAN IRIGASI D.I BONDOYUDO KABUPATEN LUMAJANG DAN JEMBER). Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

This list was generated on Mon Mar 9 21:36:28 2026 WIB.