STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER


NUGROHO, Oni suryo (2010) STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER. Undergraduate thesis, Universitas Muhammadiyah Jember.

Text
ONI SURYO NUGROHOkompres.pdf
Restricted to Registered users only

Download (9MB)
Dosen Pembimbing: KURYANTO, Totok Dwi and SUHARTINAH, Suhartinah | nidn, nidn
Item Type: Thesis (Undergraduate)
Subjects: 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering
Depositing User: wiliamarta oktaviana | oktaviana.wiliamarta@gmail.com
Date Deposited: 26 Jun 2023 03:49
Last Modified: 26 Jun 2023 03:49
URI: https://repository.unmuhjember.ac.id/id/eprint/17434

Actions (login required)

View Item
View Item