STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER
NUGROHO, Oni suryo (2010) STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER. Undergraduate thesis, Universitas Muhammadiyah Jember.
ONI SURYO NUGROHOkompres.pdf
Restricted to Registered users only
Download (9MB)
| Dosen Pembimbing: | KURYANTO, Totok Dwi and SUHARTINAH, Suhartinah | nidn, nidn |
|---|---|
| Item Type: | Thesis (Undergraduate) |
| Subjects: | 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering |
| Depositing User: | wiliamarta oktaviana | oktaviana.wiliamarta@gmail.com |
| Date Deposited: | 26 Jun 2023 03:49 |
| Last Modified: | 26 Jun 2023 03:49 |
| URI: | https://repository.unmuhjember.ac.id/id/eprint/17434 |
