Detail Tugas Akhir

STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER

NUGROHO, Oni suryo (2010) STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER. Undergraduate thesis, Universitas Muhammadiyah Jember.

Berkas Tugas Akhir

PDF
Text
ONI SURYO NUGROHOkompres.pdf
Restricted to Registered users only
Akses terbatas: khusus pengguna terdaftar Ukuran File (9MB)

Informasi Item

Item Type Thesis (Undergraduate)
Subjects 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering
Date Deposited 26 Jun 2023 03:49
Last Modified 26 Jun 2023 03:49
URI https://repository.unmuhjember.ac.id/id/eprint/17434

Actions (login required)

View Item
View Item
Ada yang bisa kami bantu?