NUGROHO, Oni suryo (2010) STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER. Undergraduate thesis, Universitas Muhammadiyah Jember.
Text
ONI SURYO NUGROHOkompres.pdf Restricted to Repository staff only Download (9MB) |
Item Type: | Thesis (Undergraduate) | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Subjects: | 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering | |||||||||
Department: | S1 Teknik Sipil | |||||||||
Depositing User: | wiliamarta oktaviana | |||||||||
Contributors: |
|
|||||||||
Date Deposited: | 26 Jun 2023 03:49 | |||||||||
Last Modified: | 26 Jun 2023 03:49 | |||||||||
URI: | http://repository.unmuhjember.ac.id/id/eprint/17434 |
Actions (login required)
View Item |