STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER



NUGROHO, Oni suryo (2010) STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER. Undergraduate thesis, Universitas Muhammadiyah Jember.

[thumbnail of ONI SURYO NUGROHOkompres.pdf] Text
ONI SURYO NUGROHOkompres.pdf
Restricted to Repository staff only

Download (9MB)

Contribution
Nama Dosen Pembimbing
NIDN/NIDK
UNSPECIFIED
KURYANTO, Totok Dwi
nidn
UNSPECIFIED
SUHARTINAH, Suhartinah
nidn

Item Type: Thesis (Undergraduate)
Subjects: 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering
Depositing User: wiliamarta oktaviana | oktaviana.wiliamarta@gmail.com
Date Deposited: 26 Jun 2023 03:49
Last Modified: 26 Jun 2023 03:49
URI: http://repository.unmuhjember.ac.id/id/eprint/17434

Actions (login required)

View Item View Item