STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER

NUGROHO, Oni suryo (2010) STUDY ANALISIS PENJADWALAN WAKTU PELAKSANAAN PEKERJAAN DENGAN METODE PRECEDENCE PADA PROYEK PEMBANGUNAN GEDUNG PENDIDIKAN STUDY ILMU KEPERAWATAN UNIVERSITAS JEMBER. Undergraduate thesis, Universitas Muhammadiyah Jember.

[img] Text
ONI SURYO NUGROHOkompres.pdf
Restricted to Repository staff only

Download (9MB)
Item Type: Thesis (Undergraduate)
Subjects: 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering
Department: S1 Teknik Sipil
Depositing User: wiliamarta oktaviana
Contributors:
ContributionContributor NameNIDN/NIDK
UNSPECIFIEDKURYANTO, Totok Dwinidn
UNSPECIFIEDSUHARTINAH, Suhartinahnidn
Date Deposited: 26 Jun 2023 03:49
Last Modified: 26 Jun 2023 03:49
URI: http://repository.unmuhjember.ac.id/id/eprint/17434

Actions (login required)

View Item View Item