PELACAKAN LOKASI GANGGUAN PENYULANG 20 KV BERDASARKAN PERHITUNGAN ARUS GANGGUAN HUBUNG SINGKAТ
LAZUARDI, MUHAMMAD DAAN AGUNG (2014) PELACAKAN LOKASI GANGGUAN PENYULANG 20 KV BERDASARKAN PERHITUNGAN ARUS GANGGUAN HUBUNG SINGKAТ. Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.
|
Text
2014 MUHAMMAD DAAN AGUNG LAZUARDI 1110622002.pdf Restricted to Repository staff only Download (23MB) | Request a copy |
Abstract
-
ContributionNama Dosen PembimbingNIDN/NIDKDosen PembimbingIr. Rusgianto, Ir. RusgiantoNIDN#Dosen PembimbingAuliq, Moh. AanNIDN0715108701
Contribution
Nama Dosen Pembimbing
NIDN/NIDK
Dosen Pembimbing
Ir. Rusgianto, Ir. Rusgianto
NIDN#
Dosen Pembimbing
Auliq, Moh. Aan
NIDN0715108701
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Keywords/Kata Kunci: | - |
| Subjects: | 600 Technology and Applied Science > 620 Engineering |
| Divisions: | Faculty of Engineering > Department of Electrical Engineering (S1) |
| Depositing User: | Rudi Setiawan | rudi01755@gmail.com |
| Date Deposited: | 29 Dec 2025 07:22 |
| Last Modified: | 29 Dec 2025 07:22 |
| URI: | http://repository.unmuhjember.ac.id/id/eprint/29058 |
Actions (login required)
![]() |
View Item |
