PELACAKAN LOKASI GANGGUAN PENYULANG 20 KV BERDASARKAN PERHITUNGAN ARUS GANGGUAN HUBUNG SINGKAТ



LAZUARDI, MUHAMMAD DAAN AGUNG (2014) PELACAKAN LOKASI GANGGUAN PENYULANG 20 KV BERDASARKAN PERHITUNGAN ARUS GANGGUAN HUBUNG SINGKAТ. Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

[thumbnail of 2014 MUHAMMAD DAAN AGUNG LAZUARDI 1110622002.pdf] Text
2014 MUHAMMAD DAAN AGUNG LAZUARDI 1110622002.pdf
Restricted to Repository staff only

Download (23MB) | Request a copy

Abstract

-

Contribution
Nama Dosen Pembimbing
NIDN/NIDK
Dosen Pembimbing
Ir. Rusgianto, Ir. Rusgianto
NIDN#
Dosen Pembimbing
Auliq, Moh. Aan
NIDN0715108701

Item Type: Thesis (Undergraduate)
Keywords/Kata Kunci: -
Subjects: 600 Technology and Applied Science > 620 Engineering
Divisions: Faculty of Engineering > Department of Electrical Engineering (S1)
Depositing User: Rudi Setiawan | rudi01755@gmail.com
Date Deposited: 29 Dec 2025 07:22
Last Modified: 29 Dec 2025 07:22
URI: http://repository.unmuhjember.ac.id/id/eprint/29058

Actions (login required)

View Item View Item