[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Nama Dosen Pembimbing | Item Type | No Grouping
Jump to: G
Number of items: 2.

G

DERMAWAN, SETYO BAGUS (2026) ANALISIS PERCEPATAN WAKTU PEKERJAAN PROYEK KONSTRUKSI DENGAN OPTIMALISASI BIAYA (STUDI KASUS : REHABILITASI JARINGAN IRIGASI D.I BONDOYUDO KABUPATEN LUMAJANG DAN JEMBER). Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

PUTRA, ARYA DZIKRULLAH AKIDA JULIANDANA (2026) STUDI OPTIMASI BIAYA DAN WAKTU MENGGUNAKAN METODE TIME COST TRADE-OFF PADA PEMBANGUNAN GEDUNG HALAL CENTER UNIVERSITAS ISLAM KH. ACHMAD SHIDDIQ JEMBER. Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

This list was generated on Tue Mar 24 12:51:44 2026 WIB.