Detail Tugas Akhir
STUDI PERENCANAAN KURVE HORISONTAL JALAN RAYA BONDOWOSO - BESUKI PADA KM.7 - KM.8 DENGAN METODE FULL CIRCLE DAN TRANSITION CURVE
KURNIAWAN, Heri
(2011)
STUDI PERENCANAAN KURVE HORISONTAL JALAN RAYA BONDOWOSO - BESUKI PADA KM.7 - KM.8 DENGAN METODE FULL CIRCLE DAN TRANSITION CURVE.
Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.
Berkas Tugas Akhir
Informasi Item
| Item Type | Thesis (Undergraduate) |
|---|---|
| Subjects | 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering |
| Divisions | Faculty of Engineering > Department of Civil Engineering (S1) |
| Date Deposited | 16 Sep 2023 03:22 |
| Last Modified | 21 Oct 2026 07:20 |
| URI | https://repository.unmuhjember.ac.id/id/eprint/19878 |
