Detail Tugas Akhir

STUDI PERENCANAAN KURVE HORISONTAL JALAN RAYA BONDOWOSO - BESUKI PADA KM.7 - KM.8 DENGAN METODE FULL CIRCLE DAN TRANSITION CURVE

KURNIAWAN, Heri (2011) STUDI PERENCANAAN KURVE HORISONTAL JALAN RAYA BONDOWOSO - BESUKI PADA KM.7 - KM.8 DENGAN METODE FULL CIRCLE DAN TRANSITION CURVE. Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

Berkas Tugas Akhir

PDF
Text
HERI KURNIAWAN.....pdf
Restricted to Registered users only

Informasi Item

Item Type Thesis (Undergraduate)
Subjects 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering
Divisions Faculty of Engineering > Department of Civil Engineering (S1)
Date Deposited 16 Sep 2023 03:22
Last Modified 21 Oct 2026 07:20
URI https://repository.unmuhjember.ac.id/id/eprint/19878

Actions (login required)

View Item
View Item
Ada yang bisa kami bantu?