Detail Tugas Akhir

(Peer review + Similarity + Document) PERENCANAAN GEOMETRIK DAN PERKERASAN LENTUR (Study Kasus: Jalur Jalan Lintas Selatan Sta.75+200 – Sta.83+510 Desa Mulyorejo Kecamatan Silo Kabupaten Jember)

Maulana, Galih Alif and Irawati, Irawati and Hamduwibawa, Rofi Budi (2017) (Peer review + Similarity + Document) PERENCANAAN GEOMETRIK DAN PERKERASAN LENTUR (Study Kasus: Jalur Jalan Lintas Selatan Sta.75+200 – Sta.83+510 Desa Mulyorejo Kecamatan Silo Kabupaten Jember). Universitas Muhammadiyah Jember, Indonesia.

This is the latest version of this item.

Berkas Tugas Akhir

PDF
Text
6 Perancangan Geometrik.pdf
PDF
Text
6 PERENCANAAN GEOMETRIK DAN PERKERASAN LENTUR.pdf
PDF
Text
6.PerancanganGeometrik.pdf
PDF
Text
1.C.6.15-Plagiasi Jurnal Nasional No. 15.pdf

Abstract

The plan for the construction of the Jalan Lintas Selatan (JLS) of Jember is the access of the southern
road of Jember along 83,510 kilometers. JLS crossed 7 districts, which were Kencong, Gumukmas,
Puger, Wuluhan, Ambulu, Tempurejo and Silo. As for Silo through Mulyorejo along 17.910 kilometers.
Field conditions in JLS Mulyorejo are Perhutani land and farm village. The purpose and objectives of the
Final Project (4 research sites) are to plan geometric and pavement thickness at JLS in Mulyorejo village
with potential area with coffee and banana plants. In addition, Mulyorejo Village has a productive coffee
management factory (PTPN.XII). From the research results (Horizontal arch): LC1 = 124.026 m, LC2 =
132.506 m, LC3 = 153.960 and LC4 = 220.868 m. For Vertical curvature: EV1 = -1.496 m, EV2 = 1.687,
EV3
=
+
0.6591
m
and
EV4
=
-0.634
m.As
for
super
elevation
planning
is
+
and
-
2%
transverse

slope.

In the thickness of pavement using the method of Bina Marga 2013 with CBR 7.5% (PU Bina
Marga, 2016) with the following results: 4.00 cm thick AC WC, 13.5 thick AC BC, 15.00 thick LPA class
A and 15.00 cm thick LPA class B.
Keywords:Planning, Geometric and Pavement Thickness 2013.

Informasi Item

Item Type Peer Review
Keywords/Kata Kunci Planning, Geometric and Pavement Thickness 2013.
Subjects 600 Technology and Applied Science > 620 Engineering
600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering
Divisions Faculty of Engineering > Department of Civil Engineering (S1)
Date Deposited 04 Apr 2023 01:43
Last Modified 04 Apr 2023 01:43
URI https://repository.unmuhjember.ac.id/id/eprint/16775

Available Versions of this Item

Actions (login required)

View Item
View Item
Ada yang bisa kami bantu?