EFEKTIVITAS PERCEPATAN WAKTU PROYEK DENGAN OPTIMALISASI TENAGA KERJA DALAM MENYESUAIKAN BATAS WAKTU KONTRAK
Abyansah, Aqsal FikrillahI Maulana (2025) EFEKTIVITAS PERCEPATAN WAKTU PROYEK DENGAN OPTIMALISASI TENAGA KERJA DALAM MENYESUAIKAN BATAS WAKTU KONTRAK. Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.
A. PENDAHULUAN.pdf
Download (1MB)
B. ABSTRAK.pdf
Download (255kB)
C. BAB I.pdf
Download (245kB)
D. BAB II.pdf
Restricted to Registered users only
Download (598kB)
E. BAB III.pdf
Restricted to Registered users only
Download (759kB)
F. BAB IV.pdf
Restricted to Registered users only
Download (3MB)
G. BAB V.pdf
Restricted to Registered users only
Download (229kB)
H. DAFTAR PUSTAKA.pdf
Download (225kB)
I. LAMPIRAAN.pdf
Restricted to Registered users only
Download (12MB)
Abstract
Frequent delays in the completion of construction projects are a common problem encountered in the field, particularly due to an imbalance between available resources and project schedules. This situation necessitates the implementation of effective and efficient acceleration strategies to avoid cost overruns and penalties resulting from delays. One method that can be applied to address this issue is the Time Cost Trade Off (TCTO), which in this study focuses on the approach of adding labor as an effort to accelerate the project. The ongoing construction project of the 3rd Floor Integrated Laboratory Building at the Faculty of Engineering, University of Jember, was selected as a case study because the project faced potential delays and serves as a real-world example of the importance of optimal time and resource management. This study aims to analyze to what extent increasing the workforce can accelerate project completion time without placing excessive pressure on implementation costs. The analysis results demonstrate that the project can be completed in 79 working days, resulting in a time efficiency of 10.23% (9 days) and a cost efficiency of 1.2% (IDR 31,493,617.9) from the normal project cost of IDR 2,627,642,636.31.
| Dosen Pembimbing: | Gunasti, Amri and Kuryanto, Totok Dwi | NIDN0009078001, NIDN003086602 |
|---|---|
| Item Type: | Thesis (Undergraduate) |
| Keywords/Kata Kunci: | Project Acceleration; Labor; TCTO; Cost and Time |
| Subjects: | 600 Technology and Applied Science > 620 Engineering > 624 Civil Engineering |
| Divisions: | Faculty of Engineering > Department of Civil Engineering (S1) |
| Depositing User: | Aqsal Fikrillah Maulana Abyansah | aqsalfikrillah15@gmail.com |
| Date Deposited: | 28 Jul 2025 07:02 |
| Last Modified: | 28 Jul 2025 07:02 |
| URI: | https://repository.unmuhjember.ac.id/id/eprint/25958 |
