[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Nama Dosen Pembimbing | Item Type | No Grouping
Number of items: 6.

DERMAWAN, SETYO BAGUS (2026) ANALISIS PERCEPATAN WAKTU PEKERJAAN PROYEK KONSTRUKSI DENGAN OPTIMALISASI BIAYA (STUDI KASUS : REHABILITASI JARINGAN IRIGASI D.I BONDOYUDO KABUPATEN LUMAJANG DAN JEMBER). Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

SULAIMAN, AGUS FEBRI (2026) IMPLEMENTASI BIM DALAM ESTIMASI QUANTITY TAKE OFF MATERIAL PADA PROYEK GEDUNG OFFICE CHAMPA HOTEL AYANA BALI. Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

PUTRA, ARYA DZIKRULLAH AKIDA JULIANDANA (2026) STUDI OPTIMASI BIAYA DAN WAKTU MENGGUNAKAN METODE TIME COST TRADE-OFF PADA PEMBANGUNAN GEDUNG HALAL CENTER UNIVERSITAS ISLAM KH. ACHMAD SHIDDIQ JEMBER. Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

BACHTIAR, ROY (2026) EVALUASI KERUSAKAN JALAN DENGAN METODE PCI DAN PERENCANAAN ULANG PERKERASAN LENTUR DENGAN METODE BINA MARGA 2017 (STUDI KASUS: JALAN RAYA SUKOREJO KECAMATAN KUNIR, KABUPATEN LUMAJANG). Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

SARI, TIARA PUSPITA (2026) ANALISIS PRODUKTIVITAS PEKERJA MENGGUNAKAN METODE WORK SAMPLING (STUDI KASUS: GEDUNG TOSERBA KDS SITUBONDO). Undergraduate thesis, UNIVERSITAS MUHAMMADIYAH JEMBER.

FAJRI, FAIZUL (2026) PENGARUH PENGGUNAAN LIMBAH BETON BAHAN DAUR ULANG SEBAGAI SUBSTITUSI AGREGAT KASAR TERHADAP KUAT TEKAN BETON. Undergraduate thesis, UNIVERSITAS MUHAMMADIYYAH JEMBER.

This list was generated on Tue Jul 28 22:02:56 2026 WIB.